New energy latest achievements
-
Shanxi Jinneng Thin Film Solar Elec...
Construction time: November 5, 2017 - December 31, 2017
Building area: 43,500㎡
Clean area: 38,000㎡
Cleanliness level: Class 100,000
Scope of contracting: plant electromechanical engineering, FMSC
More -
Tongwei Solar (Hefei) Co., Ltd. Ele...
Construction time: January 20, 2020 - June 30, 2020
Building area: 42,000㎡
Clean area: 40,000㎡
Cleanliness level: Class 10,000
Scope of contracting: ventilation, electrical engineering, piping, fire protection, built-in electromechanical professional engineering
More -
Tongwei Solar (Chengdu) Co., Ltd. E...
Construction time: May 10, 2018 - December 28, 2018
Building area: 52,555.88㎡
Clean area: 35,000㎡
Cleanroom level: Class 10,000
Product features: 3.2GW, crystalline silicon solar cells
More -
Anhui Xuancheng High-efficiency Sil...
Construction time: October 20, 2020
Building area: 18,000㎡
Clean area: 12,000㎡
Cleanliness level: Class 100,000, 10,000, 1,000
More -
Tongwei Solar (Meishan) Domestic In...
Construction time: July 1, 2019 - November 30, 2019
Building area: 47,000㎡
Clean area: 34,000㎡
Cleanroom level: Class 1,000
Product features: lithium battery related-solar panel
Scope of contracting: general contracting of construction
More -
Amprius High Energy Li-ion Polymer ...
Clean package May 5, 2016 - July 27, 2016/Clean package January 22, 2016 - June 10, 2016/Clean package June 20, 2016 - August 20, 2016
Building area: 20,000㎡
Clean area: 12,000㎡
Cleanroom level: Class 10,000/100,000
More -
E-Power Phase I Plant Infrastructur...
Construction time: February 5, 2018 - May 31, 2018
Building area: 44,400㎡
Clean area: 18,000㎡
Cleanroom level: Class 10,000 - 1,000,000
Product features: R&D and production of highly digital and intelligent lithium batteries
Scope of contracting: plant cleanrooms
More -
Hengdian DMEGC Magnetics Battery Pl...
Construction time: August 7, 2016 - September 20, 2016
Building area: 7,600㎡
Clean area: 6,000㎡
Cleanroom level: Class 1,000 (part), Class 10,000 (most part)
More -
China Lithium Battery (Luoyang) Pha...
Construction time: April 15, 2016 - July 15, 2016
Building area: 116,300㎡
Clean area: 20,000㎡
Cleanroom level: Class 10,000
Product features: L-135\L-148 power lithium batteries
Scope of contracting: plant cleanrooms
More -
Huaian Junsheng Lithium Battery Ele...
Construction time: January 1, 2019 - April 17, 2019
Building area: 74,490㎡
Clean area: 20,000㎡
Cleanroom level: Class 100,000
More -
Wuhan Changhai Electric Propulsion ...
Construction time: August 15, 2020 - March 12, 2021
Building area: 23,000㎡
Clean area: 758㎡
Cleanliness level: Class 100,000
More -
Shandong Sinoma Lithium Battery Sep...
Construction time: November 20, 2017 - September 20, 2018
Building area: 15,000㎡
Clean area: 10,500㎡
Cleanroom level: Class 10,000 - 100,000
Product features: wet process lithium battery separator, coating, etc.
Scope of contracting: electromechanical general contracting
More -
Central Industrial Base Building 21...
Construction time: July 5, 2020 - October 15, 2020
Building area: 26,000㎡
Clean area: 1,200㎡
Scope of contracting: Hunan Zoomwe plant 21# purification and electromechanical engineering
More -
Changzhou Xinhengdong TAC Purificat...
Construction time: March 2018 - November 2018
Building area: 60,000㎡
Clean area: 50,000㎡
Cleanliness level: Cleanliness test
Scope of contracting: plant cleanroom, power station, boiler room, etc.
More -
Baic Electronics Holding SK (Jiangs...
Construction time: January 15, 2019 - September 30, 2019
Building area: 87,000㎡
Clean area: 7,800㎡
Cleanroom level: Class 10,000
Product features: lithium battery related - domestic leading NCM811 automotive lithium batteries
Scope of contracting: purification and electromechanical professional contracting, secondary distribution
More -
Sinoma Lithium Battery Separator (T...
Construction time: July 30, 2020 - November 27, 2020 (contract construction period for section 1, and that of section 2 is subject to the notice of the owner)
Building area: 55,000㎡
Clean area: 13,000㎡
Cleanliness level: Class 100,000
Scope of contracting: Sinoma Lithium Battery Separator Buildings 3#, 4#, 5#, and 6#, and power station, steam pressure regulating station, outdoor pipe gallery, and plant electrical engineering
More -
Guizhou Zoomwe Ternary Precursor El...
Construction time: March 1, 2020 - May 30, 2020
Building area: 25,235㎡
Clean area: 1,430㎡
Cleanliness level: Class 300,000
Scope of contracting: ternary workshop 6 cleaning and electromechanical installation project
More -
Guangdong Genius Technology Co., Lt...
Construction time: May 23, 2020 - February 25, 2021
Building area: 220,000㎡
Clean area: 28,000㎡
Scope of contracting: fire protection system (fire water, fire power, fire smoke exhaust), air-conditioning HVAC system (air-conditioning water, air-conditioning air, condensate drain), partial decoration
More