Construction time: October 20, 2020
Building area: 18,000㎡
Clean area: 12,000㎡
Cleanliness level: Class 100,000, 10,000, 1,000
I.Civil engineering: Warehouse renovation, including decoration works (metal wall panel ceiling, metal rock wool vertical wall panel, door, air shower, air shower channel, secondary steel layer, general office area, equipment foundation, wastewater collection tank, accident emergency pool, initial rainwater collection pool, on-site nitrogen production foundation anti-static epoxy floor, elevated floor and other warehouse interior decoration works), outdoor new special gas station, class A warehouse, wastewater treatment station, and other supporting facility civil construction works.
II.Electromechanical installation works: including but not limited to HVAC engineering, power system engineering, water supply and drainage engineering, electrical system engineering, weak current and FMCS engineering, fire protection system engineering, process exhaust piping system, wastewater treatment system, special gas, waste gas treatment system, chemical system, UPW preparation and supply system, waste liquid system, secondary distribution system.
Aerial view
Group photo of the commencement ceremony