Construction time: January 1, 2019 - April 17, 2019
Building area: 74,490㎡
Clean area: 20,000㎡
Cleanroom level: Class 100,000
Product features:with the use of the latest high-capacity ternary materials, high-strength, high-security coating technology separators and industry-leading formulation system, the battery energy density would reach 300Wh/Kg, and the battery pack energy density would reach 180Wh/Kg, and the number of cycles would exceed 1,000, allowing 1-hour fast charge under high and low temperatures, with the battery duration of over 600km.
Scope of contracting:electromechanical general contracting.
Project highlights:
1.Honorary certificates (advanced unit of safe and civilized construction, excellent contractor, quality pacesetter);
2.This project was a lithium battery project with a relatively large amount of the company, and belonged to the electromechanical general contracting. The participation in the building of the entire process system for lithium battery production is of great reference significance for the company's construction in the similar lithium battery industry in the future.
Aerial view
Plant gate
Project awards
Advanced Unit of Safe and Civilized Construction
Excellent Contractor
Quality Pacesetter