Introduction to the Semiconductor Industry
The semiconductor construction of CESE2 reflects the development of the semiconductor industry across the nation.
It has advantages in terms of many domestic initiatives, high market share, and wide service range.
The company has a high-quality and stable customer base, of which more than 30% are globally famous companies.
It serves 13 of the top 25 semiconductor companies in the world, and 9 of the top 10 semiconductor companies in the country.
Service content:
Providing one-stop services:
Providing the full-life-cycle one-stop services from consulting and design to building, operation and maintenance of semiconductor projects
Whole-industry-chain layout of semiconductor engineering:
Semiconductor materials, semiconductor manufacturing, chip manufacturing, packaging and testing, printed circuit boards (PCBs), power devices, optoelectronic devices, sensors, LED epitaxial wafers, etc.
Milestone Achievement
Latest Engineering Achievements
-
Section C for Power Distribution of...
Construction time: January 17, 2020 - May 31, 2021
Building area: FAB main plant: 278,000m², total project land: 1,145,000m²
Clean area: 73,000m²
Cleanliness level: Class 1,000
More -
Chongqing No. 26 Institute Filter R...
Construction time: August 26, 2020 - September 30, 2021
Building area: The total building area is 27,870㎡
Clean area: 10,400㎡
More -
Guangzhou CanSemi 12-inch Integrate...
Construction time: January 10, 2019 - December 31, 2019
Building area: 59,000㎡,Clean area: 17,000㎡
Cleanliness level: Class 100 - 1,000
Scope of contracting: purification and electromechanical engineering
Project process equipment: Mask aligner
More -
Huahong Wuxi FAB7 Phase III Machine...
Construction time: May 30, 2020 - December 30, 2020
Building area: 130,000㎡
Clean area: 28,000㎡
Cleanliness level: Maximum Class 1
Scope of contracting: Huahong Wuxi FAB7 Phase III Machine Power Secondary Distribution Project
More -
Beijing SMIC Fab2 P2 Tianshan Proje...
Construction time: March 1, 2020 - October 30, 2020
Building area: 89,555㎡
Scope of contracting: Power-related Expansion of SMIC North P2B Tianshan Project Team
More -
Quanzhou Sanan Semiconductor Techno...
Construction time: April 2020 - Present
Building area: 16,900㎡,Clean area: 15,900㎡
Cleanliness level: Class 100/1,000/10,000
Scope of contracting: Quanzhou Sanan GaN Area 2# Houdao Plant HVAC and Purification Decoration Project
More -
Huahong Semiconductor (Wuxi) Co., L...
Construction time: December 10, 2018 - June 15, 2019
Building area: 130,000㎡
Clean area: 28,000㎡
Cleanliness level: Maximum Class 1
Scope of contracting: Huahong Wuxi Phase I CUB Plant, F1 Plant Cleaning and Purification, as well as Electromechanical Engineering
More -
Central Semiconductor Manufacturing...
Project address: Jiangsu
Construction time: July 31, 2019 - August 1, 2020
Building area: 33,000㎡
Clean area: 7,400㎡
Cleanliness level: Maximum Class 1
Scope of contracting: general contracting of construction
More
More items >
-
Localization Integration of Complet...
Construction time: November 21, 2019
Building area: 40,000㎡
Clean area: 5,600㎡
Cleanliness level: Class 100
Scope of contracting: purification and electromechanical engineering contracting
More -
Crystal-Optech Dongguan Plant Clean...
Construction time: July 1, 2020 - October 31, 2020
Building area: 22,000㎡
Clean area: 7,600㎡
Cleanliness level: Class 100, 1,000
Scope of contracting: Crystal-Optech Dongguan Plant Buildings 8#, 9# and Outdoor Pipe Gallery
More -
Qidong Jiejie Microelectronics Phas...
Construction time: July 1, 2020 - September 30, 2020
Building area: 7,000㎡,Clean area: 6,000㎡
Cleanliness level: the maximum dynamic Class 1,000
Scope of contracting: Qidong Jiejie Microelectronics Phase II Packaging Project Clean and Electromechanical Engineering
More -
Jilin Sino-Microelectronics Co., Lt...
Construction time: April 30, 2020 - September 12, 2020
Building area: 47,517.75㎡, Clean area: 8,800㎡
Cleanliness level: Maximum Class 100
Scope of contracting: Jilin Sino-Microelectronics chip plant clean pack
More -
Suzhou Semiconductor Laser Innovati...
Construction time: October 1, 2020 - January 31, 2021
Building area: 12,980㎡,Clean area: 8,000㎡
Scope of contracting: 2# plant purification and decoration project and 4# building power station room electromechanical installation project
More -
Jianghua Microelectronics (Zhenjian...
Construction time: August 1, 2020 - December 31, 2020
Building area: 48,353.8㎡
Clean area: 3,000㎡(partial)
Cleanliness level: Class 1,000
Scope of contracting: power piping and power distribution system of 18 buildings in the plant
More -
Luyi Semiconductor (Huangshi) Co., ...
Construction time: July 1, 2020 - July 1, 2021
Building area: 27,776㎡,Clean area: 3,076㎡
Scope of contracting: general contracting of Luyi Semiconductor civil construction and general contracting of Luyi Semiconductor electromechanical engineering
More -
Zhuhai Kinwong HLC Purification Pro...
Construction time: July 15, 2020 - November 15, 2020
Building area: 88,000㎡,Clean area: 7,000㎡
Cleanliness level: Class 10,000 cleanroom
More
More items >
-
Chengbei High-tech Park Advanced De...
Construction time: November 15, 2019 - July 31, 2021
Building area: 78,000㎡,Clean area: 22,000㎡
Cleanliness level: Class 100 - 1,000
Scope of contracting: EPC construction general contracting
Project process equipment: Mask aligner
More -
Wuxi ZKDX Plant Renovation and Deco...
Construction time: September 1, 2020 - January 15, 2021
Building area: 5,000㎡,Clean area: 2,800㎡
Cleanliness level: Maximum Class 100
Scope of contracting: the clean engineering and electromechanical engineering in Wuxi ZKDX detached plant
More -
Wuyi Xinshijie Semiconductor Indust...
Construction time: September 15, 2019 - December 31, 2020
Building area: 100,000㎡,Clean area: 14,000㎡
Cleanliness level: Class 100 - 1,000
Scope of contracting: general contracting of construction
Project process equipment: Mask aligner
More
More items >
-
Suzhou Nano Polis A06 Group Cleanro...
Construction time: September 2013 - March 2014
Building area: 57,000㎡,Clean area: 6,000㎡
Cleanliness level: Class 10 - 1,000
Scope of contracting: this project is about the reservation for floors 2 and 3 (6 inches), floor 4 (laboratory), and floors B1 and 1 (8 inches); Professional content: interior decoration, pipeline, electrical engineering, automatic control, HVAC
More -
TVT Micro-sensing Radar and 5G Comm...
Construction time: October 14, 2017 - September 4, 2018
Building area: 1.2548 (10,000㎡),Clean area: 2,000 (10,000㎡)
Cleanliness level: Class 1,000 - 10,000
Scope of contracting: civil construction and electromechanical installation
More -
Jinzhou Tiangong Tanghezi Industria...
Construction time: April 25, 2020 - August 25, 2020
Building area: 34,472.13㎡,Clean area: 4,081.44㎡
Cleanliness level: Maximum ISO Class 2
Scope of contracting: Phase I plant cleanroom, power station, pure wastewater, chemicals, bulk gas.
More
More items >