Construction time: July 1, 2019 - November 30, 2019
Building area: 47,000㎡
Clean area: 34,000㎡
Cleanroom level: Class 1,000
Product features: lithium battery related-solar panel
Scope of contracting: general contracting of construction
Project highlights:Tongwei Solar has three crystalline silicon cell production bases in Chengdu, Hefei, and Meishan successively, with a production capacity of over 13GW. It is the largest crystalline silicon cell manufacturer in the world, and the only cell enterprise that can exceed the production capacity of 10GW in the world. Tongwei Solar Chengdu Company was listed in the "2019 Top 100 Manufacturing Enterprises in Sichuan". In the critical transition period of photovoltaic grid parity, Tongwei vigorously promotes intelligent manufacturing, drives development with innovation, and leads Chinese enterprises to transform from manufacturing to creation, which has strongly speeded up the rapid social and economic development of China.
CESE2 has successively undertaken Chengdu Tongwei Solar Phase III, Phase IV, and Meishan Tongwei Phase I and other projects. With the spirit of greater perfection and quality priority, it has overcome numerous difficulties to escort the smooth production of Tongwei Solar.
On January 10, 2019, the company won the "Excellent Management Team Award" issued by Tongwei Solar Group; on March 26 in the same year, at the "Tongwei Solar 2nd Global Partner Conference", as the only construction unit, CESE2 won the "Cost Contribution Award" issued by Tongwei Group.
On March 23, 2019, the Tongwei Solar Phase IV 3.8GW Project was officially launched. Focusing on the unmanned production line, this project constructed intelligent plant, digital workshop, logistics and warehousing and related supporting facilities. In order to guarantee the smooth completion and production of the Tongwei Solar Phase IV Project, since the start of the construction of the project, the Project Department of the company had held more than 100 regular production meetings and regular subcontracting meetings, and continuously adjusted construction deployment according to each professional construction plan to achieve the construction nodes of all stages, and strengthen the organization and coordination with the owner, the civil construction units, the parallel contractors and other units. On October 20, the Phase IV process equipment was smoothly moved in. The project worked with its maximum capacity to ensure the construction nodes and quality, striving for the best time for the construction of Chengdu Tongwei Solar Phase IV.
For the Phase I electromechanical installation general contracting works of Tongwei Solar (Meishan) 3.8GW High-efficiency Crystalline Silicon Cell Domestic Intelligent Manufacturing Equipment (System) Application Project, the company was engaged in the general contracting of electromechanical engineering, including some power stations and outdoor pipe galleries, which won the honor of advanced quality unit. At present, it is applying for the Shuan Cup Award.