Construction time: August 15, 2020 - March 12, 2021
Building area: 23,000㎡
Clean area: 758㎡
Cleanliness level: Class 100,000
Scope of contracting: clean and air conditioning system, compressed air system, hydrogen system, oxygen system, nitrogen system, pure water system, circulating water system, process chilled water system of workshops 102#, 103#, and 105#.
Project highlights:the total investment in the fuel cell sub-project of the marine chemical power production capacity improvement project was RMB 590 million, including the fuel cell R&D center, fuel cell power system production center, fuel cell joint commissioning and testing center, and power and test area. The content included in the construction drawing of the project included hydrogen supply system, oxygen supply system, nitrogen supply system, gas monitoring system, compressed air supply system, circulated cooling water system, process chilled water engineering, pure water supply system, softened water supply system, cleanroom, information system, and the construction, commissioning, trial operation and acceptance of compressed air and pure water pipeline outside workshops101# and 104#.
Industry value:The Wuhan Changhai Electric Propulsion Fuel Cell Project has a total investment of RMB 600 million. Hubei Huanggang CSIC No. 712 Institute Hydrogen-oxygen Fuel Cell Project is a key investment attraction project of Huanggang City, and the first military enterprise in the old revolutionary base areas, with a total investment of RMB 1.65 billion. After the project is put into production, the No. 712 Institute will lay out two "10 billion" industrial bases in Huanggang City.
Aerial view
At present, the project is in the stage of temporary construction, and other photos will be collected in the follow-up construction.