Construction time: May 23, 2020 - February 25, 2021
Building area: 220,000㎡
Clean area: 28,000㎡
Scope of contracting: fire protection system (fire water, fire power, fire smoke exhaust), air-conditioning HVAC system (air-conditioning water, air-conditioning air, condensate drain), partial decoration
Project highlights: new project, currently not available.
Industry value: affected by the epidemic this year, online education has become the main education method in this special period. Such sectors are developing rapidly. The winning of the bid for the Genius project of CESE2 is of great significance to the comprehensive industry impact.
Group photo of the team
Photos of the project meeting