Construction time: December 10, 2018 - June 15, 2019
Building area: 130,000㎡
Clean area: 28,000㎡
Cleanliness level: Maximum Class 1
Scope of contracting: Huahong Wuxi Phase I CUB Plant, F1 Plant Cleaning and Purification, as well as Electromechanical Engineering
Project highlights: this project is about the design, manufacturing, procurement and supply, transportation (including secondary lightering), unstuffing and unloading, insurance, warehousing, placement, installation and commissioning, trial operation, cooperative acceptance, training, after-sales service, spare parts, special tools, defects liability period, quality guarantee period, and other related services of the corresponding cleanrooms and general electromechanical systems. These systems include but are not limited to: cleanroom environment system, cleanroom fresh air treatment system, non-clean area air conditioning system, process exhaust system, process cooling water system, process vacuum system, electrical system, FMCS, cleaning vacuum system, water supply and drainage system, VESDA system, leakage detection system, smoke control and extraction and emergency exhaust system, main pipeline system, and construction and decoration system.
Industry value:Huahong Group, is a leading semiconductor manufacturing service enterprise in China and the achievement and carrier of the national "909" project. It is a high-tech enterprise with the largest investment scale and world's first-class technology level in China's electronics industry by far. After more than 20 years of hard work, it leads China's integrated circuit production technology into the international mainstream field.
Aerial view
Aerial view of the power station