Construction time: May 30, 2020 - December 30, 2020
Building area: 130,000㎡
Clean area: 28,000㎡
Cleanliness level: Maximum Class 1
Scope of contracting: Huahong Wuxi FAB7 Phase III Machine Power Secondary Distribution Project
Project highlights:this project is about the construction, commissioning, completion acceptance, and engineering maintenance of each system-related material and equipment within its scope. The system includes: Power, PV process vacuum, Exhaust process exhaust, Chemical, UPW (ultrapure water), Drain (production drainage), IW tap water and related work involved in the above-mentioned work (including but not limited to support and hanger, pipe rack, and bridge).
Industry value:Huahong Group, is a leading semiconductor manufacturing service enterprise in China and the achievement and carrier of the national "909" project. It is a high-tech enterprise with the largest investment scale and world's first-class technology level in China's electronics industry by far. After more than 20 years of hard work, it leads China's integrated circuit production technology into the international mainstream field.
Aerial view
Aerial view of the power station