Chemical pharmaceuticals latest achievements
-
Oral Preparation Production Base of...
Construction time: September 1, 2017 to June 6, 2018
Building area: 29,000 ㎡
Clean area: 8,000 ㎡
Cleanliness level: Level D
Scope of contracting: Cleanroom and public computer room
More -
Solid Preparation Project of Lunan ...
Construction time: May 11, 2017 to September 8, 2017
Building area: 10,000 ㎡
Clean area: 10,000 ㎡
Cleanliness level: Level D
Scope of contracting: Solid preparation (capsule + tablet)
More -
New workshop #2 of Livzon Group Fuz...
Construction time: July 15, 2020 to September 25, 2020
Building area: 10,532 ㎡
Clean area: 224.315 ㎡
Cleanliness level: Good Manufacturing Practice for Pharmaceutical Products (GMP certification)
More -
Electromechanical Installation Proj...
Construction time: June 13, 2020 to October 30, 2020
Total construction area of the whole plant: 48,954 ㎡
Total construction area of the project: 32,299 ㎡
Scope of contracting: Electromechanical installation of tank farm, power station, outdoor pipe gallery, synthesis workshop, finished product warehouse and hazardous waste warehouse
More -
Expansion and reconstruction of Lan...
Construction time: August 20, 2020 to September 20, 2021
Building area: 3,774 ㎡
Clean area: 1,650 ㎡
Cleanliness level: Maximum Class D
Scope of contracting: Land B F/3 and F/4 electromechanical decoration and steel structure engineering
More -
Construction Engineering of Anqing ...
Construction time: October 13, 2019 to November 27, 2020
Building area: 33,675㎡
Clean area: 27,000 ㎡
Product features: The products involved are high-end raw APIs and innovative preparations for anti-tumor and tumor diagnosis, anti-infection, analgesia, cardiovascular, diabetes and anti-allergy etc.
Scope of contracting: General contracting of construction
More