Electromechanical Installation Project of Advanced Vitamin Production Base of Jiangxi Kexing Pharmaceutical Co., Ltd.

Construction time: June 13, 2020 to October 30, 2020

Total construction area of the whole plant: 48,954 ㎡

Total construction area of the project: 32,299 ㎡

Scope of contracting: Electromechanical installation of tank farm, power station, outdoor pipe gallery, synthesis workshop, finished product warehouse and hazardous waste warehouse

Project highlights:This is a professional contracting project for electromechanical installation engineering, including hoisting and installation of power-driven equipment and process production equipment; Procurement (excluding valves and instruments) and installation of power pipeline and process pipeline system; Electrical engineering procurement (excluding power distribution cabinets) and installation (excluding high voltage equipment), procurement (excluding air conditioning units and side wall fans) and installation of ventilation engineering, and secondary optimization, design and installation of APIs in whole production process.

Industry value:Jiangxi Kexing Pharmaceutical Co., Ltd. is funded by Professor Liu Meixing from Zhejiang University and mainly offers the products of biotin, β-carotene and canthaxanthin. These products are the main raw materials of pharmaceutical preparations and mainly exported to Europe and America. This project belongs to the key project of Shangrao's economic development inspection in 2021.

 