Semiconductor (Materials and equipment)

Nantong Jiejie Semiconductor New Plant Electromechanical Engineering

Construction time: December 1, 2016 - May 15, 2017

Building area: 42,533㎡

Clean area: 12,216㎡

Cleanliness level: Class 100 - 10,000

Scope of contracting: clean air conditioning, air conditioning automatic control, decoration, electrical distribution, power lighting, water supply and drainage (excluding fire protection), process piping and some external works.

Project highlights: semiconductor manufacturer of thyristor devices and chip slicing IDM (integrated device manufacturer, that is to say, covering the entire chip industry chain, integrating chip design, manufacturing, and packaging and testing) in the field of power semiconductor devices in China.

 

Project HD renderings (aerial view)

 

Live view of project completion

Project awards

2018 - 2019 China Construction Engineering Luban Award (International Quality Project)

2018 Quality Engineering Award "Yangfan Cup" Third Prize