Panel display (Display terminal)

Chibi Wanjin Industrial Purification and Decoration Project

Construction time: April 5, 2020 - October 30, 2020

Building area: 140,000㎡,Clean area: 26,000㎡

Cleanliness level: the level of the overall cleanroom is Class 10,000, while that of part of it is Class 100

Scope of contracting: buildings 3# and 4#, CUB 5#, and wastewater station

Project highlights:this project is about the design, procurement and supply, transportation, unpacking and unloading, warehousing, placement, installation and commissioning, trial operation, cooperative acceptance, training, defects liability period, quality guarantee period, and other related services of the cleanrooms and general electromechanical systems. These systems include but are not limited to: cleanroom environment system, cleanroom fresh air treatment system, non-clean area air conditioning system, process exhaust system, process cooling water system, process vacuum system, water supply and drainage system, air conditioning water system, power distribution, process distribution, general lighting, and emergency evacuation lighting system.

Industry value:The Wanjin Industry Electronic Glass Production Base Project is a large-scale electronic glass protective substrate production base introduced by the People's Government of Chibi City and invested and built by Vitalink Industry (Chibi) Co., Ltd. It is a key engineering project of Hubei Province and the No. 1 project of the Chibi Government. The project mainly produces electronic glass protective substrates, mobile phone cameras, and other high-tech products. After the project is fully put into production, it can achieve an annual output of about RMB 1.5 billion to 2 billion, which will inject new impetus into the economic and social development of Chibi City.

 

Aerial view

 

Live view of the plant