Panel display (Display panel)

CTO Industry Co., Ltd. LCD Panel Production Line Project

Construction time: April 3, 2020 - August 30, 2020

Building area: 342,400㎡

Clean area: 70,000㎡

Cleanliness level: Class 100 - 1,000

Scope of contracting: Zhengzhou CTO plant secondary distribution

Project highlights:this project is about the secondary distribution system engineering, and the systems include but are not limited to: process exhaust system, process cooling water system, process vacuum system, electrical system, water supply and drainage system, bulk gas system, special gas system, and chemical system.

Industry value:it is the first LCD production enterprise in Henan Province. The project introduces LG G5 TFT-LCD panel production line of South Korea, and adopts the A-SI (amorphous silicon, i.e., A-SI) technology. The size of the glass substrate is 1,200mm*1,000mm, and the 1.44 -42-inch display products for different application categories can be produced.

 