Life science industry
Construction time: October 10, 2020 - February 25, 2021
Building area: 10,600㎡, Clean area: 1,600㎡
Cleanliness level: Maximum level 10,000
Scope of contracting:Design part: overall design of floors 1-7 of the criminal technology building, including laboratory process design, laboratory decoration engineering (special room decoration included), public area decoration, ventilation and air conditioning engineering, water supply and drainage engineering, electrical engineering, gas path system, centralized laboratory control and management system, and laboratory wastewater and waste gas treatment systems, except for fire protection engineering and intelligent engineering. Construction part: laboratory and public area decoration engineering (including some special room decoration), laboratory benches and fume hoods, ventilation and air conditioning engineering, water supply and drainage engineering, electrical engineering, gas circuit system, centralized laboratory control and management system, and laboratory wastewater and exhaust gas treatment systems of the criminal technology building I.
Project highlights: The Criminal Technology Center of Taiyuan Public Security Bureau was constructed according to the overall plan of "one institute, three bases and three centers" of Taiyuan Public Security Bureau in 2018, and it was planned and designed according to the requirements and instructions of the Party Committee of the municipal bureau and Mayor Ma to "build Nitun Criminal Technology Center into a first-class criminal technology building in the country", and the overall requirements of complete functions and reasonable design. The completion of this project marks that the criminal technology of the Taiyuan Public Security Bureau has entered a new period of coordinated development, being among the leading provincial capitals in the country.
Aerial view
Criminal technology business building I