Life science industry
Construction time: August 10, 2020 - November 25, 2020
Building area: 13,600㎡, Clean area: 1,800㎡
Cleanliness level: Maximum Class 10,000
Scope of contracting:scheme design, preliminary design, construction drawing design and relevant services of the criminal technology building I laboratory project and sewage detection laboratory and hair detection laboratory on the west side of the 1st floor of the criminal technology building II; engineering construction and material procurement, and other project general contracting content.
Project highlights:The Department of Public Security of Shanxi Province Criminal Technology Business Building Laboratory Project has eight floors above the ground and one floor underground, with a building area of about 13,600m2. This project integrates the food, drug, and environment laboratory, wastewater, hair detection laboratory, and fire detection laboratory into the criminal technology laboratory for the first time, being the public security criminal technology laboratory with the most complete functions at present. The completion of this project will definitely become a benchmark project in the industry. Besides, as an EPC project, it lays the foundation for the promotion of the EPC mode in the laboratory industry.
Aerial view
Criminal technology business building