Laboratories (Poultry house)

CAHIC Lanzhou Biopharmaceutical Plant Production Area Overall Relocation Project (Phase I) - A2 FMD, A3 Inspection Poultry House

Life science

Workshop purification, decoration and electromechanical installation

Construction time: July 1, 2019 - August 30, 2020

Building area: the total building area is 21,165.39m², among which the area above the ground is 15,107.66m², and hat under the ground is 6057.73m²

Scope of contracting: CAHIC A2, A3 workshop electromechanical installation

Project highlights:clean siding installation, purification and decoration, electrical system, air conditioning system, water supply and drainage system, industrial steam system, fire protection system, automatic control system, refrigeration house, process water system (including water for injection, pure water, pure steam, process drainage), compressed air system, COz system, equipment procurement and installation (including equipment supplied by Party A), outdoor pipe network, GMP validation, biosafety equipment (facility) installation, and so on.

Industry value:with a large domestic animal base, the market for the animal vaccine industry is promising. There is a large base of many economic animals in China, and the stock of many species ranks first in the world.

 