Construction time: August 1, 2015 - July 28, 2017
Building area: 101,451㎡, Clean area: 3,500㎡
Cleanliness level: Class 100 - 100,000, meeting the corresponding testing standard - Architectural Technical Code for Hospital Clean Operating Department (GB 50333-2013)
Scope of contracting:construction, clean decoration and general decoration, HVAC, electrical engineering, weak current, water supply and drainage, medical gas, and exhaust gas emission within the shaded range of the design drawing of central supply room on the second floor, ICU and operating department on the third floor, equipment floor and UPS room on the fourth floor, and delivery room on the fifth floor (areas excluding stairwell and elevator room);
Project highlights: a comprehensive Grade II Level A traditional Chinese medicine hospital integrating medical treatment, teaching, scientific research, rehabilitation, health care, and pre-disease treatment.