Construction time: April 20, 2017 - February 20, 2018
Building area: 188,800㎡, Clean area: 7,835㎡
Cleanliness level: Class 100 - 300,000
Scope of contracting:ICU and KCU on the third floor, operating department on the fourth floor, delivery room and NICU on the ninth floor, and the equipment floor on the fifth floor. Professional content of purification engineering: including decoration engineering, strong current engineering (IT system, UPS system), weak current engineering (call-intercom system, monitoring system, access control system, background music system, network system, etc.), automatic control system engineering, water supply and drainage engineering, HVAC engineering (air conditioning system, air conditioning water system), and medical gas engineering.
Project highlights:
1.Winning the "Excellent Project Quality Award";
2.As another benchmark of Grade III Level A hospital purification medical project in the southwest area, it will become a business card for further expansion of related medical purification projects;
3.As the first Grade III Level A hospital in Banan District, it will further improve the medical service capabilities of Banan District. At the same time, it will further improve the health and family planning service systems at the three levels of district, town and village in Banan District, providing guarantee for medical care and people's livelihood.
Renderings
Real shots of the front door
Project awards
Excellent Project Quality Award