Food and pharmacy (生物制药)

Electromechanical Installation Project of Shanghai Ambio Pharm, inc. (Section 1)

Construction time: February 15, 2019 - now

Building area: 15,000㎡

Clean area: None

Scope of contracting: Electromechanical installation engineering of three major regions- workshop 3 power station, outdoor pipe gallery and outdoor tank farm

Project highlights:No cleanroom is equipped for this project which mainly involves the in-depth design of general electromechanical engineering, procurement, transportation, unloading, storage and installation of equipment and materials, system trial run, commissioning, defect liability period, quality assurance period and other relevant services. The system mainly consists of three parts: process pipeline, utility pipeline and electrical power.

Industry value:Shanghai Ambio Pharm, inc. is a foreign-funded pharmaceutical enterprise, with Bai Juncai as its legal representative who is a high-end scientific and technological talent included in Shanghai's "Thousand Talents Program". The undertaking of this project is conducive to further expanding the market of high-end pharmaceutical products among all foreign-funded pharmaceutical products.

 

Aerial view

 

Outdoor pipe gallery