Food and pharmacy (生物制药)

Pharmaceutical Base Project of China Agricultural Veterinarian Biology Science and Technology Co., Ltd.

Construction time: August 20, 2019 to July 31, 2020

Building area: 5,028㎡

Clean area: 1,100 ㎡

Scope of contracting: Contracting of Electromechanical Installation

Project highlights:China Agricultural Veterinarian Biology Science and Technology Co., Ltd. is at the leading position in the industry and the shareholding company of Veterinary Research Institute. The planned total investment for the base project is about RMB 1.06 billion, with a total coverage area of 110,000 m2 and a construction area of 130,000 m2. It has 16 buildings (structures) to be constructed in two phases. At Phase I, quality inspection workshop, R&D semi-workshop, production management building, avian coccidiosis vaccine production workshop, animal security inspection room, animal immunization and efficacy inspection room, animal isolation room, etc. are built. The main auxiliary facilities include primary and secondary guard rooms, power station, waste transportation station, sewage treatment station, fire pool and pump house, etc.

This project company takes charge of all electromechanical engineering (except for civil engineering) including fire control, third-party testing, disinfection verification engineering etc. In addition, the project has been rated as "Major Construction Project in Gansu Province and Lanzhou City in 2018". By implementing such project, the company has broader influence in the field of biosafety.

 

Aerial view

 

Civil engineering construction drawing