New Project of Sub-packaging Workshop 2 of Ningbo Rongan Biological Pharmaceutical Co., Ltd.

Construction time: April 1, 2020 to July 10, 2020

Building area: 3,207㎡

Clean area: 680㎡

Cleanliness level: Level B, C, D

Scope of contracting:Including plant infrastructure engineering, purification and decoration engineering, purification and air conditioning system engineering, electrical engineering, automatic control engineering, water supply and drainage engineering, fire control engineering and proper handling of equipment purchased by Party A, excluding process pipelines (purified water, injected water, pure steam, compressed air and vacuum), outdoor steam pipelines, and procurement and installation of high/low voltage distribution cabinets in substations.

Project highlights: This project is the design, manufacturing, procurement and supply, transportation (including secondary lightering), unstuffing and unloading, insurance, warehousing, placement, installation and commissioning, trial run, cooperative acceptance, training, after-sales service, defect liability period, quality guarantee period, and other related services of the corresponding cleanrooms and general electromechanical systems. These systems include but are not limited to: Cleanroom environmental system, cleanroom fresh air treatment system, non-clean area air conditioning system, process cooling water system, process vacuum system, electrical system, cleaning vacuum system, water supply and drainage system, fire hydrant system, fire alarm system, smoke control and exhaust system, main pipeline system, building and decoration system, etc.

Industry value:Upon completion of Sub-packaging Workshop 2 Project of Ningbo Rongan Biological Pharmaceutical Co., Ltd., it can increase the production capacity of rabies vaccine, further expand the market share of rabies vaccine of Ningbo Rongan Biological Pharmaceutical Co., Ltd. and improve the weight of the company in the vaccine industry.

   

Construction of cleanroom