Project location: Chengdu, Sichuan
Service content: scheme design, construction drawing design, and deepening design
Project building area: about 24,000㎡
Project introduction: including 5 production lines of non-hormonal aerosol workshop, blow-fill-seal (BFS) workshop and hormone-based dry powder inhaler (DPI) workshop, nasal spray workshop, and aerosol workshop, and one weighing and preparation center, one QC R&D laboratory, and one quality inspection center.