Hengdian East Magnetic High Efficiency PERC Single Crystal Cell Project

Mechanical and electrical general contracting and secondary distribution engineering

Construction period: December 10, 2019-

Building area: 28000

Clean area: 16800

Cleanroom level: up to 10000 levels

Category:
 
 

Product Features: Photovoltaic Modules -1.6GW High Efficiency PERC Single Crystal Cells

Scope of Contracting: Construction secondary decoration engineering, purification engineering, HVAC engineering, gas power engineering, electrical engineering, weak current engineering, water supply and drainage engineering, pure wastewater engineering, and related secondary distribution

The Hengdian Dongci 1.6GW high-efficiency crystalline silicon battery production project, with the concept of unmanned, intelligent, and digital, will be built into an efficient crystalline silicon battery factory that is currently leading in photovoltaic industry technology, production equipment, automation, and intelligence.

This project has a construction area of approximately 28000 square meters and a clean area of approximately 16800 square meters. Our company provides clean room systems and clean production supporting facilities that meet relevant requirements, including building secondary decoration engineering, purification engineering, HVAC engineering, gas power engineering, electrical engineering, weak current engineering, water supply and drainage engineering, pure wastewater engineering, and related secondary distribution engineering. The total calendar days of the construction period are 105 days, with a short duration, fast pace, high difficulty, and good quality; We plan to meet the move in condition on February 10, 2020.

 



 Panoramic shooting


 

 

 
  • Back to Top