Tongwei Solar (Hefei) Co., Ltd. Electromechanical Installation Project

Construction time: January 20, 2020 - June 30, 2020

Building area: 42,000㎡

Clean area: 40,000㎡

Cleanliness level: Class 10,000

Scope of contracting: ventilation, electrical engineering, piping, fire protection, built-in electromechanical professional engineering

Category:
 
 

Project Highlights: this project is the electromechanical installation works of Tongwei Solar (Hefei) Co., Ltd. with an annual output of 5GW high-efficiency crystalline silicon solar cell module project. The total project includes all lighting, fire protection piping, water supply and drainage works of three workshops (M3 component workshop, U5 power station and M3a solid waste warehouse), purification and decoration, HVAC, electrical engineering, water supply and drainage, gas power and other related professional works. This project adopts the form of steel structure, with a building area of 52,334.1m2 and a clean area of 40,000m2


Aerial view