A new energy EPC general contracting project

Construction period: April 5th, 2021 to March 5th, 2022

Building area: 58 acres

Clean area: 34000

Cleanliness level: Class C

Scope of Contracting: EPC

Category:
 
 

Project Highlights: This project includes the design, manufacturing, procurement and supply, transportation (including secondary transportation), unpacking and unloading, insurance, warehousing, positioning, installation and commissioning, trial operation, cooperation and acceptance, training, after-sales service, spare parts, special tools, defect liability period, quality assurance period, and other related services for the corresponding clean room and general electromechanical systems, civil engineering. The system includes but is not limited to: clean room environmental system, clean room fresh air treatment system, non clean area air conditioning system, process exhaust system, process cooling water system, process vacuum system, electrical system, bulk gas system, water supply and drainage system, pure wastewater system, chemical pipeline, smoke alarm system, leakage detection system, smoke control and emergency exhaust system, main pipeline system, building and decoration system, etc.

 

 

  • Back to Top