中文
中文
Construction unit: Beijing Chip Advanced Technology Inc
Project location: Haining Economic Development Zone, Zhejiang Province
Service content: scheme design, construction drawing design
Project investment: RMB 120 million
Construction scale: building land: 28.64 mu; building area: 31,500㎡; Cleanroom area: 24,000㎡
Construction period: January 2019 - July 2020
Project product: integrated circuit chip packaging and testing
400 892 1298
苏ICP备15056857号-1 Enterprise Post Office
COPYRIGHT©ALLRIGHTSRESERVED.China Electronics System Engineering No. 2 Construction Co., Ltd.
Business Scope
Corporate Culture
Party Building