Nantong Jiejie Semiconductor New Plant Electromechanical Engineering

Construction time: December 1, 2016 - May 15, 2017

Building area: 42,533㎡

Clean area: 12,216㎡

Cleanliness level: Class 100 - 10,000

 
 

Scope of contracting: clean air conditioning, air conditioning automatic control, decoration, electrical distribution, power lighting, water supply and drainage (excluding fire protection), process piping and some external works.

Project highlights: semiconductor manufacturer of thyristor devices and chip slicing IDM (integrated device manufacturer, that is to say, covering the entire chip industry chain, integrating chip design, manufacturing, and packaging and testing) in the field of power semiconductor devices in China.