Huahong Wuxi FAB7 Phase III Machine Power Secondary Distribution Project
Construction time: May 30, 2020 - December 30, 2020
Building area: 130,000㎡
Clean area: 28,000㎡
Cleanliness level: Maximum Class 1
Scope of contracting: Huahong Wuxi FAB7 Phase III Machine Power Secondary Distribution Project
Project highlights:this project is about the construction, commissioning, completion acceptance, and engineering maintenance of each system-related material and equipment within its scope. The system includes: Power, PV process vacuum, Exhaust process exhaust, Chemical, UPW (ultrapure water), Drain (production drainage), IW tap water and related work involved in the above-mentioned work (including but not limited to support and hanger, pipe rack, and bridge).
Industry value:Huahong Group, is a leading semiconductor manufacturing service enterprise in China and the achievement and carrier of the national "909" project. It is a high-tech enterprise with the largest investment scale and world's first-class technology level in China's electronics industry by far. After more than 20 years of hard work, it leads China's integrated circuit production technology into the international mainstream field.
![]() |
![]() |
Aerial view | Aerial view of the power station |